RE: Shame he didn't do his homework15 Dec 2021 23:47
Ibug,
interesting, looks like TPAO drill cheap finder wells, minimal site, small rig, slim hole, minimal casing. If successful come back later and drill on a production site with 'production' size hole with full casing programme based on knowledge gained.
Could it be that the targets are hard to define, so high risk?
Don't gold plate it - big rig, big site, long access track, lots of planning based on dodgy maps - hmmm.
What would AME have done if UKOG weren't paying - or perhaps UKOG wanted the performance - and weren't worried about what happened next - like BB and the production completion installed before testing, which had to be removed
No mitigation of the risks - expecting only for a most positive outcome - or certainly appearing to, perhaps for the gallery?