Too many Adrians15 Oct 2022 19:10
Adrian,
Back again this weekend eh.
I’d say never trust someone who says he sees something he hasn’t.
Adrian in October on twitter - surface pump not on HH-1 all July (‘the pump was off the well all of July‘) but on 14 July tweets:- ‘New pump fitted working well’.
Unfortunately even if, as you claim, you were only tweeting about the downhole pump it can’t be seen (it’s downhole) and needs the surface pump to work, let alone ‘work well’.
I’m well aware that the 189barrels produced in July were from just a few days production – but why didn’t they resume production in July – please don’t claim it was because they were working on HH-2z, they continued flowing HH-1 while drilling HH-2/2z.
Then there’s the rubbish you posted about production in December 2021 (and much the same for January 2022):- ‘I make it more than 100 bopd at HH since intermittent pumping resumed in September."
December 2021 production 62bopd.
And you’re trying to suggest that HH-2z could be operational:- ‘Do we know if the water reinjector well is up and running at Horsehill? Does anyone have eyes on the site that could put some pictures up? I guess we will find out soon’
Here’s a prediction – the water reinjector well isn’t up and running today, and unless you have x-ray vision pictures won’t show anything, until UKOG RNS news that they are converting the well I’ll stick to my view it hasn’t happened.
After all, over a year ago:-
'Adrian@davethedrill1
Sep 20, 2021
I told him and Pingo works have started at #Horsehill. I put pictures up and still that jerk says I'm lying even after today's RNS confirming I am 100% correct. #UKOG Up next the Water reinjector permit. You heard it here first.'
Yet I had posted this on 2 September 2021:-
'or it could be to do with this (from Interim Results RNS June 2021):-
'We are carrying out modifications at the site to comply with The Control of Major Accident Hazards regulations (lower tier), as well as other regulations. Liaison continues with the Health and Safety Executive and the Environment Agency ("EA") to ensure the Horse Hill site satisfies these regulations.'
Nothing else is planned this year according to UKOG's Jan 2021 forward plan.'
Adrian lives in a world where if facts don't suit his narrative he just makes stuff up - 'I put pictures up and still that jerk says I'm lying' - what I said you were lying about was that UKOG were preparing for HH-2z conversion no pictures showed that - permit arrived May this year, and you had claimed next RNS would be EA permit:
'Adrian@davethedrill1
Aug 31, 2021
#ukog next RNS EA permit for water injector for HH2'
I’d be very wary of someone who makes claims he knows what's going on because he watches the site every now and then – and then makes stuff up - not forgetting that Adrian makes up that anyone he disagrees with is green, except when he's deramping when even his 'mates' come in for abuse.
'nuff said.