Why now?10 Apr 2018 13:49
Seems a bit strange that they've issued this detailed update presumably just days before the Feasibility study comes out.
For the oxide ore, phase 1 :
"The Feasibility Study will be based on the currently estimated resource of 1.05 million ounces of gold, at a grade of 0.84 grammes per tonne ("g/t"), which represents only a small proportion of the identified strike length of Tulkubash mineralisation (2.0 kilometres out of 24.0 kilometres)."
For the Sulphide, Phase 2 "The Kyzyltash Resource is currently estimated at 5.4 million ounces of gold at a grade of 3.75 g/t. Again, only a small proportion (3.0 kilometres out of 24.0 kilometres) of prospective strike length has been explored to date."
I wonder if they are preparing us for the quite probably not-so-dramatic Feasibilty results, as they will be for much smaller possible resource than we are hoping to find eventually?????