RE: Passage to PFS2 Jun 2026 14:26
It doesn't include the DFS. You can calculate from the number of metres they said they are going to drill for the PFS (22,500m I think it was) and the expected drilling rate (20m/day/rig given in the planning document), that this 10-12 months is for the 22,500m.