RE: MRE's8 Aug 2021 22:10
Hydro - did you read and understand Bamps' post? He said "The 4.2m in the maiden resource will be reduced for the Indicated resource, the volume is a lot smaller"
A proportion of that 4.2m (that in the SE crescent to 360m depth) will be converted to indicated. The recent infill drilling in that area will also be classified as indicated but IMO because of the reduced size of the relevant area and the stricter definitions for indicated v inferred, will not increase the 4.2m figure by much if at all. I believe the inferred figure will increase, but bear in mind that it will exclude the areas moved to indicated.
Also, increase in inferred resources will have limited affect on project valuation for IIs, as they come with limited level of statistical confidence and guarantee of extraction.
Not sure why you want to pump these figures up as high as possible, unless you are looking for a short term boost to the SP