focusIR May 2024 Investor Webinar: Blue Whale, Kavango, Taseko Mines & CQS Natural Resources. Catch up with the webinar here.
On another RNS matter, the current dividend allowance is £2000 - so anyone with more than 70k Shares will be hit.
The dividend allowance for 23/24 drops to £1000 and in 24/25 £500.
RE RNS - What was all the agitation regarding early repayment and final redemption of the BONDS.
It seems to me the solution was available throughout.
P-beck :
Jan 23 to March 23 hedge volume is 5.25Mtherms plus deferred volume of either total 2.25Mtherms, total 7.5Mtherms (730mmscf) ie 7.9mmscf/day.
OR if deferred volume is spread over all H1 then 5.25Mtherms plus 1.125Mtherms total 6.375Mtherms (620mmscf) ie 6.74mmscf/day.
I have zero knowledge of the oil and gas industry - but what little I do know is that the drilling of a well involves steel casing strings to various depths fixed in place by pumping cement and forcing it into the gap between the rock and the casing.
As the Sidetrack is entering an existing well (SP7) does this mean any actual “SPUDDING” does not begin until a horizontal attempt is started ??
OR is there some repair work on the way down.
Experts to advise.
I believe National Grid entry pressure can be ranging in pressure from 38 to 85 bar.
The pressure from the two SFB two wells, A4 and B2, remains high at about 54 bars.(RNS 30th SEPT22).
Does this mean that the installed single compressor is largely currently REDUNDANT ?? - someone with more expertise required to advise.
Scotty. You can do it yourself VIZ;
https://mip-prd-web.azurewebsites.net/DataItemExplorer
??Enter “Saltfleetby” and click on “search” - expand (drop down)“reports” and choose second option “Physical entry” and expand(drop down) and select 5th option “volume D+1”.
At “Criteria” at bottom select “latest value” and ‘applicable for” - then change “From date” to 1st say, and click on “value Data for Data items”.