I have zero knowledge of the oil and gas industry - but what little I do know is that the drilling of a well involves steel casing strings to various depths fixed in place by pumping cement and forcing it into the gap between the rock and the casing. As the Sidetrack is entering an existing well (SP7) does this mean any actual “SPUDDING” does not begin until a horizontal attempt is started ?? OR is there some repair work on the way down. Experts to advise.
??Enter “Saltfleetby” and click on “search” - expand (drop down)“reports” and choose second option “Physical entry” and expand(drop down) and select 5th option “volume D+1”.
At “Criteria” at bottom select “latest value” and ‘applicable for” - then change “From date” to 1st say, and click on “value Data for Data items”.
RE: George Lucan’s company is only at the foothills.3 Oct 2022 16:46
Asher - Good luck - I think you will do it easily - your Daughter will have the grandest time of her life - as you say hopefully pushing 10p !, within the year.
The RNS forecast of 6mmscf/day (1.87Mtherms/month) from say mid October will be enough to cover the Q4 hedge (1.75Mtherms/month).
The H1 2023 hedge at 10.5Mtherms + 2.25Mtherms (deferred) will average 2.125Mtherms per month hedged - which will be easily covered by the anticipated increase in production from 2nd compressor and Sidetrack.
Maybe as high as 12mmscf/day = 3.733Mtherms/month.