RE: Risk?4 Dec 2021 09:44
Fred - correct.
"The Lancaster field is currently only producing from the P6 well, which utilises artificial lift via an electric submersible pump ("ESP") to support production. In March 2021, pressure variability was observed in the P6 well while utilising the lower ESP, with subsequent investigations suggesting a potential partial obstruction to fluid flow above the lower ESP. Production was restored to prior rates after a well intervention which switched over to utilising the upper ESP in the well. Investigations are still ongoing into the root cause of this issue. Should the upper ESP in the P6 well fail in the future, there is a risk that the lower ESP cannot be restored to full function, in which case the Company might need to flow the well at lower rates."
In the same RNS is the only thing that might save this company. Drilling well P8 in 2022.