RE: Expected new flow in next 6 months3 Aug 2018 18:27
Also, there is a possibility that drilling costs for RHA could be reduced if PREM chooses the same drilling contractor for Zulu who are willing to do it for free. Further to this, RHA has a lab which does all the analysis of samples in-house which reduces the cost even more and speeds up the process.