RE: Drill6 Nov 2019 12:23
"If I am right over the drill starting again today, by Monday slotted liner should be going in, "
I doubt it - they have to clean the well up, drill another 1000 ft, condition the well and then run logs on the drillpipe (as they can't run wireline in a horizontal well) - which means pulling everything out, fitting the logging gear, running in slowly and out slowly to log and then rig up the liner etc
I'd guess 2 weeks after they reach TD - so around 24th Nov