RE: MO - Elicence1 Aug 2019 12:32
Hey CC
LOL, there is no well number, could be 146 flowing at last ??? Can be pretty sure is MJF as states North-West Yelemes Field.
Is referencing intervals using the Vv notation, i.e. V6, V7 and V8 with no depths mentioned, so not sure.
is not one of the more prolific wells, i.e. 143 or 144 as they have much higher rates of gas, is a mystery, probably 142 or 146 !!!
Did see a new tender for an "A5 Lateral well", so sounds like A5 side-track may venture into a horizontal plane, wonder how far, maybe a couple of hundred metres through the hot-spot, is another mystery, maybe clarification in investor call or accompanying presentation.
Tender is complete and is for approx $2.6m (1b KZT).
--
Tender 144784637 - BNG LTD LLP (BiEdDzhi Ltd) announces a tender: Drilling of a lateral well bore A5, Ayrshagyl square, with subsequent testing and development
Description of the tender: BNG LTD LLP (BiEnDzhi Ltd) announces the tender: Drilling of the lateral well bore A5, Ayrshagyl square, with subsequent testing and development (with the result)
Contract Amount: 1 000 000 000,00 KZT
Get financial help
Start of the show: 07/31/2019
End date: 07/31/2019
Application Number: 144784637
Type: Single Supplier
Tender analytics
Branch: Science, research, education
Possible industries:
Construction, real estate and architecture / Construction site preparation, land works
Region: Kazakhstan / G. Almaty / Almaty
Link: https://www.bicotender.ru/tender144784637.html
Cheers, MO