RE: RE: Presentation21 Jun 2023 12:38
In a way, it's more important for He1 to ensure the Rig is in full working order and carry out a very thorough inspection of that, as well as ensuring the necessary documentation is in place, simply because we are drilling first with this Rig. Therefore, if any complications arise, it will mess up our drill and not NHE's.
When He1 were previously sourcing a Rig (the one before the Exhalo option), it took a long time to inspect and audit that Rig. DM often made the point that it was vitally important that any issues are remedied whilst the Rig is in the inspection yard, than when its been mobilised to Rukwa.
And so as well as the contracting side of things, I am sure the Rig has been going through extensive checks and testing, which might explain the time it has taken? All imo and dyor