RE: Is it just me10 Jan 2023 08:20
Ricky, just because you are paranoid does not mean that everyone is not out to get you.
There is nothing Ricky you are making it up in your head.
Picture a piece of land 97km squared near your home, picture plans for roads, electricity, water etc in, surface water drainage out with traps for any dirt etc so it does not get into the rivers, then two areas for plant to be sited, where raw material will be brought in, tailings out, liquid from tailings to be recycled back into the plant, the fuel storage and bunding in case of leaks, human facilities, repair areas all got to be drawn up in great detail, currently being tweaked for optimization like virtually every other mine on the planet, very few go through as per the original plan. Then they are contracting for two stages, firstly 100,000 plus finished material upping to 300,000 tonne output per year, any contract of that size, the second being over 1.5 billion dollars per year is not going to be written at your local solicitor, that is going to be a global leader in mine legality.
This is massive, it is moving at pace for its size.
Buy into a little lithium mine somewhere else and it should move faster if speed is your thing.