Tweet from Kochang today4 Jul 2024 13:47
The team had a good day at Kochang mine, the smaller of our mines in South Korea but has an easier and quicker path to production. JV at legals, progressing and looking to conclude. As a reminder -
Produced c.110,000 oz Au (19.6g/t) and 5.9Moz Ag (1,000g/t) from 1961-1975.
c.2.5km strike - 600m between the 2 mines not exploited.
Non JORC estimate 550-700Kt, grading between 5.2-6.6 g/t Au and 27.3-34.8 g/t Ag.