RE: The rise has begun21 Mar 2022 09:05
Suggins,
It was and here's my previous post, which shows the drill results as listed in the CPR.
"Here's the Significant drilling results from 2012 drilling on the hill, for future comparison.
KPB013
from 26m 6m @ 1.89 g/t
from 47m 1.01m @ 4.97 g/t
from 26m 1.92m @ 1.71 g/t
KPB014
from 101m 6.59m @ 2.41 g/t
from 115m 2.54m @ 10.74 g/t
KPB015
from 79m 2.95m @ 2.47 g/t
from 88m 1.71m @ 1.9 g/t
from 96m 1.01m @ 1.26 g/t
from 103m 3.05m @ 3.1 g/t
from 112m 1m @ 1.14 g/t
KPB016
from 128m 0.75m @ 8.67 g/t
KPB017
from 66m 0.25m @ 11.85 g/t
Another point bearing in mind is the deeper intercept are not really deep, as after all they are drilling above surface level on the hill. Although from Robbie's comments the other day, none of the RC holes sound like they are going past 100m, if they've drilled 15 RC holes for 1,500 already. But the DD holes, which obviously take a lot longer to drill each metre than RC ones, are going to around 200m."
Further comment : I believe they are drilling on the other side of the Hill to previous drilling(that's the impression I get when I chat to JB), so confirming that the narrow veins extend to the other side will confirm the strike length.