Another missed drill?31 Mar 2026 08:00
"The other well, the Diana-1, designed to test a Wilzetta Fault play, will be drilled during Q3 2024" - FAIL
"Wolverine-1 is planned to be spudded during Q4 2025" - FAIL
"The Crossroads well, planned to be spudded in Q4 2025 will penetrate a large 100 acre structure in the prolific Oil Creek Sand" - FAIL
"The Crossroads well, following regulatory delays, is now scheduled to be drilled in Q1 2026" - FAIL ?