Fortnight21 May 2024 06:42
No not the game that kids are obsessed with but 2 weeks today is 5th June and the original extension date of the Petroleum Agreement.
The BoD (hopefully) haven't been doing sweet fanny adam these last weeks so by the time of the amendment I'd expect an update is due. The proposed window for drilling MOU-5 will have passed and we will be several weeks from the Amendment 4 being ratified.
I'd say failure to provide an update by then would be something of a dereliction by the BoD, although I'm not sure that concerns them. PG I think feels this is his project and he can proceed how it pleases and we should all be grateful he is doing so.
Personally, I'd like them to get on and test, having proposed doing so was urgent last summer and admitted the missed testing window in Sept was his fault (although I wonder if he was covering for OHNYM and taking the heat) we need to crack on.
Chariot should also be done with drill by two weeks on Friday. As we aren't funded for a major drilling programme if MOU-5 is a success and we flow test successfully (along with SDX options later in the year for SV-101) I'd say grab the rig and go for it. The data will probably take quite some time to fully analyse in any case.
Fwiw I think they likely have been bust getting ducks in a row and the 4th amendment extends beyond 5th June.