PYX Resources: Achieving volume and diversification milestones. Watch the video here.
Sefton
Had a great preso from 3 majors on CCS arranged by some Magic Citcle chaps yesterday. Interesting stuff.
So why didn't you fly over then "bloody Nigel"
The equipment is on site the services I'd dare say come with the rig to some extent and others will be procured along with the rig timing they arr working too even if it hasn't yet been shared.
Gudin
You probably don't know any better than I whether Sound has it booked first or PRD (I know what Graham at Sound has said about it hopefully going to them after Chariot). One of the problems with opaque comms and dates slipping.
If we have the opportunity first I'd take it first.
Lancey
Thanks I'd seen GRH tweet - we aren't funded for an endless drill programme. Hence probably better to get before Sound and option it after them giving BoD time to calrifynl route forward if drilling is a success.
Ford
Seems we will but be good to know a bit more about the when. To me it makes sense to get SV101 after Chariot, drill MOU-5 then let Sound have it while results are analysed/options considered.
I hope SJ prep now well advanced
Not sure what catalyst would be for a rocket undet the SP short of testing. Any deal with a partner to novate contracts is surely sub-optimal currently until we begin proving up.
Equally for cost of drill I'm unsure why we would need to farm out unless for a carry on multiple drills across MOU-5. In this instance could be good insurance against disappointing flow test results (not that I expect that to be the case).
In the 5th Feb RNS they indicated SV-101 should begin drilling MOU-5 by 31st May as contracted. Someone previously mentioned Chariot drills may take 2 weeks each so that would be end May.
The BoD has announced that Sandjet would occur after approval for No.4 amendment was received, we have this now.
They did not announce commencement of rigless testing PH.1 just the results.
Hence, I wonder if the aim is to complete Sandjet by late May/early June. Drill MOU-5 and allow rig to move to sound while results are analysed and evaluated for next steps.
Think it would be up PG Street to pull a rabbit out of the hat.
End of the day he will work to the timelines they can effect and little said here will change this.
In the 5th Feb RNS they indicated SV-101 should begin drilling MOU-5 by 31st May as contracted. Someone previously mentioned Chariot drills may take 2 weeks each so that would be end May.
The BoD has announced that Sandjet would occur after approval for No.4 amendment was received, we have this now.
They did not announce commencement of rigless testing PH.1 just the results.
Hence, I wonder if the aim is to complete Sandjet by late May/early June. Drill MOU-5 and allow rig to move to sound while results are analysed and evaluated for next steps.
Think it would be up PG Street to pull a rabbit out of the hat.
End of the day he will work to the timelines they can effect and little said here will change this.
I wonder if commencement of Sand Jet needs to be RNS'd or just the results.
PG has made clear it isn't up to him to create trading opportunities so dare say he'd quite like to just announce results if he could.
Not suggesting it has started just wondering aloud about what form news may take.
Findme
I think most on here have had sufficient opportunity to adjust their risk and reward profile to get comfortable with their portfolios.
Nothing is guaranteed and nobody states that it is - this was something I banged on about when ao first posted and unless you're blind, GRH has mentioned that irreducible risk remains.
Not sure who you think you're saving to be honest. Most aren't here for 20BCF more for hundreds of BCF and maybe multiple TCF.
I believe the hundreds of BCF to be possible and that would do me nicely in terms of juicing overall returns. Anything else is a bonus although welcome of course. Could it have been done sooner (I note prospectus BRV highlighted mentioned SandJet testing in mid-23) so yes of course it could but testing is where its at now with some further drills then we will either be at the races or gone to dogs. Don't think anyone is blind to that.
Thebold
He isn't saying it is Ghawar, he is saying his analysis points him to believe there is a strong read across to other large fields.
If there are two large structures MOU5-Mou4 and MOU1-3 is all connected that's alot or Oil/Gas.
By all means disagree but no reason to drag others thought process down in doing so.
I think GRH output is valuable here as is Methodology/Keith Oz/Seabright etc (there are many others)
BRV
Thank you, I'll have a read on the train tomorrow.
If there is a link to licence details, much appreciated. I'd checked the website and also Sleeping Giant but could not locate the full Ts&Cs or whatever version of them may be public domain.
TIA if anyone can help.
AV
I'm pretty sure Potential is in the OED and has a specific, so unlike your posts it doesn't mean nothing.
In this context the.potential is the possible discovery or a major gas resource but it is by no means certain- possible though so for many they are willing to see if the potential reward comes to fruition hopefully within a sensible overall risk approach to portfolios.
Just checked the Morocco.section of the website - seems a little aged!!!!
RNS to go there for further information. Blimey
Ibiza
Several years ago two management consultants from the North East struck on the bright idea of building a couple of semi sub rigs in Huddersfield/Hull way. These are much more complex than SV-101 but the lenders lost hundreds of millions.
I'd imagine SV-101 has quite a lead time to construct and would cost in the tens of millions to build let alone getting a consortium of experts together to ensure the correct design spec and construction capability.
Often order books are filled well in advance and few are built speculatively.
Keith
An excellent post and what many of us have posited as a way forward in terms of prove flow for CNG then sign GSA with upfront payment or complete a raise.
The technical element around depth is newer to me in terms of analysis and seems like a good option. Particularly being funded to do multiple drills.
Ninja
Don't subscribe to the get it last mantra, of there are delays because Chariot decide to drill further holes or Sound/Chariot encounter issues (not unheard of) we potentially don't see the rig for even longer. In such eventuality weather can interrupt ops too. I'd rather have been next in line and drilled, it has been said previously much of the prove up drilling would be left to others so it appears a bit of a contradiction.
Also, unsure how a 10 drill campaign at our leisure because we are last in line is to be funded.
To be fair BillyRay, 26bcf is quite the.prize wonder what CoS is for that?!
As for CoS on Sandjet I'd say that's a good deal higher and the BoD is happy to await the outcome with no thought of placement given the provisional GSA that may be cemented in event of good results. That would start to release new funding avenues outside of placements and dilution.
Glad to see a short pause as Still movingnfinds around to add here.