RE: This Robbie is a switched on chap.19 May 2022 14:55
@Legalwolf - I should add that if Robbie is taking this pragmatic approach then funds were raised for getting the mine up and running to the point of heap leach pads.
The final step of stage 3, to get to 24,000 oz per annum, the board perhaps decided not to raise the money until they were able to show it is worth doing the mine expansion (by increasing the measured resource). As such, the fund raise in Q3, all being well, is for the final stage of expanding Kilimepesa. It suggests a pragmatic and prudent approach to the mine expansion.
All eyes on the updated resource numbers next month! I think that it should include 5200m of RC drilling on the hill. The intial intention was to drill 12000m, which has (encouragingly) been increased to (I think) 16000-17000m RC drilling. So the update next month should include approx 1/3 of the hill drill results.
Again the hill is one of 10 (I think) potential drill targets at Kilimepesa.