RE: Sanderson interview yesterday24 Apr 2021 17:28
wizard
I had already read that but we are not producing 100% oil from HH-1 and we have no idea what the mix will be when the injector is in operation so I ignored the modelling based on the fact that any water cut had not been taken into account. I did note "The water will be re-injected at rates up to a maximum required to achieve full reservoir voidage replacement, which would restore the reservoir pressure to close to pre-production levels. However, this is unlikely to be achieved from the water resources on site." but not sure how much this would cost to tanker in. Perhaps they could help Brockham out by taking their water.