RE: "Sarah Finch, a campaigner from the Weald Action Group who brought the test case, wants to see the site shut down"27 Oct 2024 10:46
ZYX098
UKOG shot themselves in the foot. It was them that said anEIA was required."1.2 The Need For An Environmental Statement
4. Based on information acquired to date, once operational, the Site could produce in excess of 500 tonnes
of petroleum per day for commercial purposes. This level of production exceeds the threshold set within
the Town and Country Planning (Environmental Impact Assessment) Regulations 2017, above which an
environmental impact assessment (EIA) must be performed."