RE: Soma/ El Limon Royalty to RRR clause 3.6 in the settlement agreement7 Aug 2025 14:50
Spec as usual you get everything wrong.
I am not an Insider. Regardless of what Boring Boy says nor am I a connected party.
The information about the settlement agreement is public knowledge. I have it in writing from the company that it is in the public domain.
Separately, I have posted it several times now but whatever. Read what Soma says:
"The El Limon Project (“El Limon”) is located in Antioquia, Colombia and is adjacent to the Company’s operating El Bagre Project. El Limon includes a past-producing underground mine and a gold processing plant with a capacity of approximately 225 tpd. In 2024, the Company resumed exploration activities at the Limon mine. El Limon is subject to a 3% NSR royalty, to a maximum of US $2 million. Upon reaching the US $2 million NSR royalty threshold, the NSR royalty decreases to 0.5% up to a maximum of US $1 million."
In the above, when using "El Limon" the company is referring to the "El Limon Project". The project includes the mine and the mill. So it is saying that NSR applies to the mine and the mill.
The wording was changed as a result of my letter to the auditors. Note they are no longer intimating that non-El Limon ore is excluded from the NSR. Anyway, they are now saying between 25 tpd and 100 will come from former illegals on the El Limon tenement. See the presentation dated 7th July.
DYOR