RE: 10 bagger?24 Dec 2020 09:33
AB said in his Proactive Investors video that the development work between AFC and ABB was to design the electronics that sit between our Fuel Cell system and ABB's battery and EV Charger system. Nothing else needs to change.
This should be a quick thing to do; share circuitry schematics and specifications with the joint project team, let them work out what circuits need to talk to each other and what parts are needed, design the circuit board, make a version for testing, confirm the design work to spec, move to designing a final production version and away we go.
This could be done in a few weeks, alongside AFC building an AFC containerised system for joint ACF+ABB demonstration to AFC+ABB clients, just like the previous roadshow, with international clients invited to several presentation dates.