Timelines differ for both projects. Indiana site is pretty much turnkey, the material will be processed offsite, minimal capex, they have reiterated a few times producing starting second half of year, with 15k oz from that one before taking into account expansion.
Andacollo realistically will be early 2027, that would have been later on this year too but the regulatory halt in Canada to be fair longer than they reasonably expected. Within 18 months production should ramp up nicely towards 100k+ oz Au overall across both sites, plus the copper, where who knows on volume but judging by Teck's adjacent mine figures it'll be massive, with significant scope to grow volumes of both metals towards a blue sky number. At which point we get our valuation in the billions. GL