RE: Potential funding sources18 Nov 2022 10:58
The operation has been approved on a state level so it’s the highest level approved by the Senate, the drilling applications however is a standard process, which takes into account where you are drilling in consideration to the position, depth, site layout, the well design where the aquifers are the roads in and out, safety plan, whether the leases are in good standing that other operations in area within a mile is informed of the drilling plan, all of this will be done by Tom Suchoski from Stantec this is all necessary work to perform in the operations but are basically a formality, and have been in process for 8 weeks.