RE: Side track21 Mar 2024 11:28
Once they get started, you'll have about 14days as per presentation to wait for initial results. Plug the existing well 1 day, Drilling is 1 day. Running prod tubing and cementing 2 days. Do whatever stimulation they are doing 1 day, set up and install the rod pump 2 days, start pumping, leave it a week to clean up to a decent level, there shouldnt be much to clean up and hey presto 250bbls a day. Let it run for a few weeks and then replace it with the leccy pump and let it build up to its optimum figure. Early success indicators should be around a week after they start poking around in the hole, 2 weeks after kick off should give us a idea of the potential. However you look at it, its not far off. 6 weeks or maybe less depends when they get started in April. Hope they get the mud weight right, heavy enough to hold back the formation. Drill bit seems to have been designed to make fine cuttings which can be brought to surface with the lighter mud.