Re : bopd16 Jan 2019 07:42
Yep, cheers for that. It confirms rns accuracy, proactive can be forgiven, misdirected rns's are not acceptable.
I did say that we may be surprised at the results from the 'hole poking'. I like to idea that holes can be poked a couple of metres depth into the formation through the casing at targetted locations based on pnn logs. The drillling action I presume is less destructive to the rock structure ( just a guess tbh). Also assume that each hole is poked independantly, therefore the process is perhaps tad slower.
If i otial prod vs stabilised follows typical behavior, I guesstimate that it could settle at around 60-70. News on this will hopefully be forthcoming in next couple of weeks before the next 3 wells are poked in Feb.
I have borrowed the poked expression from little earn, it is something that I would probably have said myself during an eloquently written post.
Stop the selling today guys ffs. This was a great result and the set up at Rustavi looks professional too. Two sets of equipment, two mud pumps, hoppers, connecting pipe, storage, tool bits, etc blag de blah. Some other junior oilies should take note.