RE: Final top up1 Oct 2020 10:23
Kalengwa Project: Our 30% interest in the Kalengwa copper silver project in Zambia, where Bezant acts as operator, was acquired in April 2020 and comprises a large exploration licence surrounding one of the richest open pits ever worked in Zambia. During its working life, the Kalengwa mine, produced 1.9 million tonnes of ore at an average grade of 9.4% copper with over 25% of the ore mined exceeding 20% copper. The exploration licence has numerous indications of similar geology, along with poorly tested geochemical and geophysical anomalies, which could lead to discovery of further typical Copper Belt mineralisation. The key areas of interest include sparsely drilled copper mineralisation just 4km northeast of the main pit and a 13km strike zone of coincident geochemical and structural anomalism, which has not been drill tested. We are planning for a reconnaissance drilling program at Kalengwa.
Hope Copper Gold Project: We completed the acquisition of 100% of Virgo Resources +70% interest in the Hope and Gorob licences in Namibia, which already have a combined Mineral Resource of 10.2Mt @1.9% Cu and 0.3g/t Au at a 0.7% Cu cut-off, reported in accordance with the JORC Code (2012). The concession has a further untested potential mineralised area of over 150km as well as additional targets for drill testing adjacent to the Hope and Gorob deposits.
Post-acquisition, archive search, showed that the values of gold at Hope were on many occasions higher than the average in the mineral resource statement, including some values over 1g per tonne. Samples from the Gorob deposit were not assayed for gold by previous owners, thus giving the impression that no gold existed. The Company intends to commence a reconnaissance drilling programme to test the Gorob prospect for gold and to increase the resource base in the area surrounding the Hope property.