Highlights:
The 2019 PFS Update for the Cinovec Project has been updated to demonstrate the effect of changes in the mining process to incorporate the use of paste backfill, which results in an increase in annual production, together with changes in lithium and by-product prices to reflect current and expected market conditions.
Annual production of battery grade lithium hydroxide monohydrate modelled to increase from 25,267 tpa to 29,386 tpa, an increase of 16%.
NPV8 (post tax) increases from US$1.108B to US$1.938B, an increase of 74.9%, based upon a lithium hydroxide price of USD17,000 per tonne which is significantly less than the current price.
Post tax IRR of 36.3% and a payback period of 2.5 years from the commencement of production.
Up-front capital cost due to backfilling plant and additional capital costs to produce 29,386 tpa lithium hydroxide increased to US$644m.
This 2022 PFS Update assumes the life of mine extraction of 13.1% of the Measured and Indicated JORC Resources at Cinovec.
Use of tailings for backfill will result in a far smaller environmental impact, further enhancing the Project’s already strong ESG credentials.