RE: RNS30 Jun 2023 11:44
Hi all. Quite a detailed RNS, which I’m pleased about, but although things are said to be progressing well, the PFS is actually running behind schedule, if we read back from the RNS of 21 February. Completion for this was targeted for ‘during’ H1 2023:
“Pre-Feasibility Study
On 9 January 2023, Grafintec announced the award of a PFS contract to RB Plant to assess the technical, economic, statutory, regulatory, and commercial options for a natural flake graphite micronisation, spheronisation, purification, and coating plant in Finland.
The study will investigate the Best Available Technology ("BAT") with consideration for environmental, operational, and financial factors and performance, for transforming a high-grade natural flake graphite concentrate to graphite anode material suitable for the European LIB market opportunities and is targeted for completion during H1 2023.
The PFS is a key part of Grafintec`s strategy to develop a Finnish value chain for anode materials production, aligned with the objectives of the funding received from Business Finland as part of the BATCircle2.0 (Finland-based Circular Ecosystem of Battery Metals) consortium. BATCircle2.0 is a key project in Business Finland's Smart Mobility and Batteries from Finland programmes.”
Only a point. So to say it’s progressing well, isn’t the case, in terms of timescale only.
In my view, but probably still soured by our last RNS.