RE: Doom & Gloom20 Jun 2018 09:01
MO, Chilts, DD - Look, we did see one load slippage down to 17 - 18 days (Load #16), and MO noted that this particular period coincided with a hell of a lot of visits from FS Cygnus, possibly to support optimisation works. We're now noting average production in the circa 40K BOPD levels, extrapolated for Load #17 and hopefully for Load #18, given the 13 day window for this load. Given all of this, Enquest may have wanted to see steady output, in line with load 17 and 18, before final sign-offs and giving BUMI the full day rates for AK. So, we could be close to a final sign-off, and it's possible that they may want to see another load around early July before final sign-off. All of this is speculation obviously, but needless to say, progress is being made (and seen). ;-)
Enquest has never guided for an average 50K BOPD production rates at this stage, as is being inferred by some of the posters. This should realistically happen after DC4 comes online in Q1 2019.
Have some patience chaps, the SP will come good soon !!!