RE: News is due on 3 wells....17 Dec 2025 10:00
This is all the info I have ........ A6- Spud Nov 2015 TD 4750m, stopped at 4528m, targeting middle and Lower Carboniferous, From the analysis of wireline logging , gross oil-bearing intervals totalling 127 meters have been identified. These are in two intervals, the first of 72 meters between depths of 4,313 meters and 4,385 meters. The second is of 55 meters between depths of 4,450 and 4,505 meters, A 54m oil bearing interval perforated from a depth of 4450m, perforation needs workover RNS 10/1/2017, Analysis of mud and wireline logs has shown the presence of a hydrocarbon bearing reservoir with a vertical column potentially in excess of 100 meters, In April 2017 the top 60 meters of the 100-meter plus interval were successfully perforated using a different leading international contractor. A chemical treatment at the well is underway 1/12/25 currently seeking to bring well into production RNS 3/12/25