Caspian Sunrise Summary.
BNG:- Includes ..MJF/South Yelemes/Yelemes Deeps/Airshagyl ..1561 sq Km contact area of which 1376 sq Km has 3d seismic coverage, 40 Km from Tengiz (Nearology) The group announced the disposal of MJF and South Yelemes for a consideration of $88m in July 2024
MJF:- Cretaceous/Jurasic independent 4 way dip enclosed structure Shallows Export licence to 2043
141:- Spud 2015 depth 2500m Sidetrack commence Dec 2023 27m of stuck pipe
142:- Spud 2015 depth 2500m Dec 2023 new sidetrack, 3 intervals, 1 now flowing at 160 BOPDs
143:- Spud 2013 depth 2750m Tender for pipe lines to GZU Oct 2023
144:- Spud 2017 depth 2750m up to 700 BOPDs 7mm choke
145:- Spud 2017 depth 2750m Workover failed Feb 2024
146:- Spud 2017 depth 2750m
150:- Spud 2019, 1st infill well, up to 500 BOPDs
151:- Spud 2020, 3rd infill well, to be re-drilled horizontal
152:- New well planned as a horizontal drill
153:- Spud 2020 depth 2503m Workover in prog was producing 830 BOPDs 8.5mm choke
154:- Spud 2021 depth 2548m, up to 645 BOPDs
155:- TD reached, oil detected over 22m length, perforated 16m, now flowing at 700bopds
South Yelemes:- Cretaceous/Jurasic fault and dip bounded Shallows Full production/export licence to 2046
54:- Soviet sub economic 30BOPD workover Q1 2024 2000m targeting Dolomite interval
805:- 160 BOPDs, 2222m targeting Dolomite, Sidetracked 2200m-2300m Jul 2024 flowing at 250 BOPDs with 806
806:- Targeting Dolomite Sidetracked 2200m-2300m Jul 2024
807:- Workover Q1 2024 2000m targeting Dolomite
808:- Spud 2017 3200m 6 intervals potential new structure, drilled to 3070m, inconclusive testing, high water saturation, 2 shallow intervals of interest not yet tested
815:- Spud Jul 2024, TD 1900m expected to take 2 months, targeting Dolomite interval, depth at 240m as of 12/7/24
Yelemes Deeps:- Upper Devonian/Lower Permian 36sqKm Salt layer typically 3000m – 3500m Appraisal licence until August 2025, 25 year full production licence applied for August 2024
801:- Sinopec drill, spuded Dec 2014 Drilled to 4950m/5050m? Jul 2015, abandoned not commercial Jul 2024
802:- Spud 2022, stuck pipe, work halted Total depth 4200m flowed at 700-900 bopd 100m earlier than expected looking for partners
803:- Spud Dec 2023, Primary target 3950m, secondary 4200m oil detected over 60m 3360m-3420m, above salt layer testing underway of 15m, now flowing at 500bopds Sep 2024
804:- New well planned