RE: Cairn energy12 Mar 2019 07:29
From Cairn
"Kraken
Gross production from Kraken (Cairn 29.5% WI) averaged 30,300 boepd in 2018, which was below expectations. Production levels were most significantly affected by production system outages on the FPSO, weather-related incidents and higher water-cut than originally expected. Cairn is working with the field operator and FPSO contractor to achieve improvements in the uptime of the FPSO and a planned shut-down is scheduled later in 2019. Reservoir performance has been evaluated and at year end, Cairn's estimation of Kraken 2P reserves has been reduced to reflect current performance. This has resulted in an impairment of US$166.3m in the carrying value of the Kraken asset. The JV is evaluating further investment opportunities in the Kraken area to provide new drilling opportunities in 2020.
The DC4 subsea infrastructure was successfully installed in H2 2018. The three-well DC4 drilling programme is ongoing and remains on schedule with production onstream from the first DC4 well."