RE: Transmission Line tweet14 Apr 2021 12:49
Another coincidence? I highlighted the Selemo map from 2016 yesterday showing a pipeline to the SW of Lesedi and a planned 300Mw plant plus Orapa pipeline. I have little doubt TLOU saw that, knew there are shareholders who misunderstand everything that is possible , or impossible in some cases, and have now clarified the current position for us.
The latest plans are so much better one pipeline and a tx line to Orapa and Serowe!
Saving the pipeline SW, the road to Serowe if that was a lorry, the lorries themselves and drivers, a second power station and associated substations, bottling plants, bottles, the list grows forever! That is what the TLOU board AND the Govt have achieved over the last 5 years or less. At least that is what I see , plus the substations and tx line are now assigned to our sub-contractors! I think things are pretty good. Finance and dewatering resumption look to be possible one ofthese days to make 2021 a red letter year.
I just saw a trailer for Eastenders! Makes me smile that Mick was unaware that he'd fathered a daughter when he was in care at the age of 12 years, yet the daughter who was conceived within marriage many years later looks older! :O)