RE: Gaurav on Twitter!17 Sep 2018 23:44
F92 , so dtu probably not required , is that your feeling, I thought that we might use dtu. On the previously drilled wells but the distance between wells was pushing it. But it could have depended on the fracs IE the width of fracturing they were planning which was not known, so my assumption in previous posts that there could be infill wells. But if the play is wider fracking in the formation ,which from reading numerous papers can be quite varied. My feeling is that dtu could still be used . If the fracs planned are wide so in fills won't be possible, but do the company think they can release that load without an extra $6m x 8 drilling costs but with the aid of Dtu at lower costs.. What do you think plausible or not.