RE: Dumps12 Feb 2025 15:47
just some back of the *** packet maths.
xtr have paid $300000 for some tailings @ $1.15 per tonne. that's 261000 tonnes.
if there is 1% copper, that's 2,600 tonnes of copper.
if 0.5% copper, that's 1,300 tonnes of copper.
if 0.25% copper, that's 650 tonnes of copper.
at 9,500 usd per tonne that gives a value of:
1% = 24.7m usd
0.5% = 12.3m usd
0.25% = just over 6m usd.
that completely ignores costs, which won't be minimal. i'd also argue the likelihood of it containing more than 0.25% average is minimal.
so we've done some research, spent 300k of our hard earned for the possibility, some way down the line (if colin can be trusted to deliver lol) of 3-6m (us dollars).
that's not an elephant. it's a cat, hiding in a haystack, yawning because it will take months for him to be found...