RE: Other assets21 Sep 2024 23:19
Nowhere else matters at the moment bar the VSC and West Dome Deeps.
Reason being Telfer had a MRE resource update last December of 21m ton or there about, 9.6mt will be in a stockpile by 1st Oct, NEM will produce from it. Ggp will takeover probably with 20mt left and are saying this will take 15 months, well that is 2 trains working nearly flat out. That is half one 2026 then there is a further 20mt in other stockpiles not in any MRE resource. That takes us till H1 2027 so that fits in with Havieron ore 2027 but that’s around 6 months stockpiling around 540,000 tons only 2 weeks processing.
They need to supplement this from especially the VSC and the Main Dome open pit new cut back and the West Dome new cut back.
The VSC has a figure of 1.3moz so is significant and could easily be 10 years Mine Life there.
You can probably see now why the Havieron ore is now 2027, it will ramp up to full production of 2.8m oz by 2029 and beyond.
The bulk handling ideas need or will become more prevalent as the production ramps up.
I really like the idea of this railveyor looks very promising, just google it and see what you can find.
Paddy’s post yesterday really is referring to 2028 and beyond but I believe trucking at that rate is difficult and needs that railveyor or conveyor.
3 bed trucks carry around 120 tons
4 bed around 150-175 tons
Divide those into 2.8mt and you will see what I’m getting at.
Exciting times.