RE: Town hall meeting25 Sep 2024 10:07
From my own point of view I was surprised how excited by the West Dome deeps Shaun is, more than I am and that’s saying something.
I would like to refer back to my post of 21st Sept
“ Nowhere else matters at the moment bar the VSC and West Dome Deeps.
Reason being Telfer had a MRE resource update last December of 21m ton or there about, 9.6mt will be in a stockpile by 1st Oct, NEM will produce from it. Ggp will takeover probably with 20mt left and are saying this will take 15 months, well that is 2 trains working nearly flat out. That is half one 2026 then there is a further 20mt in other stockpiles not in any MRE resource. That takes us till H1 2027 so that fits in with Havieron ore 2027 but that’s around 6 months stockpiling around 540,000 tons only 2 weeks processing.
They need to supplement this from especially the VSC and the Main Dome open pit new cut back and the West Dome new cut back.
The VSC has a figure of 1.3moz so is significant and could easily be 10 years Mine Life there.”
The first I should have added those 3 orange areas on the slide showing these 2 anomalies.
He said the bottom of the West Dome open pit was high grade and easy to get at, so will be the first to be mined next will come the north end of the pit then the Main Dome these 3 will increase the stockpiles to 70m tons so that’s another 2 years of full plant processing. The underground workings will add upto 1-2mt per year.
I asked about the VSC already fan drilled and is it ready to go and he said yes but is lower grade only 1.8-2g/t (only 🙂) and will only be used as an infiller but it’s open in most directions and at least 10 years life. He went on that the West Dome deeps is much higher grade and will be easy to mine with a horizontal access to the hoist.
Expect big things from this orebody it’s great news 🤣