The BB seems to have gone back to normal, I would just like you all to compare what we have and what Capricorn Metals are upto. Thank you to Grace and others kind support.
The Karlawinda Gold Project, Pilbara.
In April 2020, Capricorn Metals reported a 35% increase in the ore reserves of the project to 43.5 million tonnes (Mt) graded at 0.9g/t of gold (Au) containing 1.2 million ounces (Moz). The reserves estimate includes Bibra (contained gold of 1.09Moz) and Southern Corridor (contained gold of 111,000oz).
The total mineral resources of the project are estimated to be 86.7Mt graded at 0.8g/t of Au for 2.14m oz.
Construction of the processing plant began in June 2020, while pre-production mining activities are expected to commence in December 2020. Commissioning of the plant is expected by March 2021 and the first gold is anticipated by June 2021.
Peak pit production rate is expected to be approximately 7Mt per quarter and will be maintained for more than a year before decreasing to a steady rate of approximately 4.5Mt per quarter for three years. The production profile will then adopt a natural downward trend as the material will only be sourced from the Stage 3 pit while approaching mine plan completion.
The mining fleet will include eight 130t haul trucks, four 100t haul trucks, as well as 300t, 200t and 100t excavators. The ancillary equipment will include dozers, graders, loaders and watercarts.
The ore will be treated using standard processing technology involving single-stage crushing, a 4.8MW single-stage semi autogenous grind (SAG) mill and a 4.8MW ball mill (SAB) grinding and gravity recovery, and conventional cyanide leaching and carbon in leach (CIL) recovery process.
The processing plant design comprises a crushing circuit, crushed ore stockpile, grinding and classification, gravity recovery, leaching and adsorption, elution and electrowinning, and smelting.
A 306-room accommodation village became operational in the first half of 2020, while the 44km-long site access road is practically completed.
The project will involve the construction of a 16MW gas-fuelled power station with 2MW of diesel back-up.
They are doing all this for 50m of mineralised ore to get at 1m+ ounces of gold.
Havieron has somewhere between 700-800m of mineralised ore and 20-30m ounces with equivalents.
I'm very confident with my investment here and the journey has hardly started.