RE: Malcy Interview with CH29 Apr 2022 11:35
As Whistler rightly picks up:
"16-2 ready to flow,just infrastructure to complete.
Next 3 Wells can be connected straight away as infrastructure will already be in place."
So by the end of the year there will be 3 wells flowing from the Paradox and possibly the exploration well too.
With 16-2 production tests running smooth at 1083 boepd (and potential for over 2k), similar wells will result in at least 3k boepd cashflow added to Williston.
That's more than the current M-cap annualised.