RE: OGA October1 Jan 2021 16:32
Malaysian accident was in Oct and impacted production in Oct:
Average production in Malaysia in the ten months to end October 2020 was 7,115 Boepd, 15% lower than the same period in 2019. This decrease was primarily driven by a detached riser at the Seligi Alpha platform which provides gas lift and injection to the Seligi Bravo platform. This resulted in a release of gas and a subsequent fire which initiated an automatic emergency shutdown of the PM8/Seligi field. The Group's safety systems and emergency response procedures were successfully implemented, with the fire extinguished quickly and all personnel onboard mustered safely. Following an initial investigation and safety assessment, partial operations were able to be recommenced within two days, with wells flowing under natural pressures. Production is currently at c.40% of normal levels with a single compressor train operational. Remediation activities to allow production to be returned to normal levels are currently being assessed, although production is expected to remain constrained through the first half of next year.