RE: Placing coming30 Oct 2025 11:19
According to the RNS 15 Feb 2022, KZG avoided the need for a water pipeline, by recycling water.
"In Namibia, the works undertaken by the Company's wholly owned subsidiary, African Tantalum, in conjunction with DJ Drilling, has led to the entire refurbishment and redesign of the plant. ....................... the Company's water recycling techniques, which were designed to achieve a minimum of 65% water re-usage, have surpassed expectations with 95% of water being recovered. The Company is now confident that it can achieve the levels of production anticipated without the capital cost and engineering risk associated with building a pipeline to the Orange River."