The latest Investing Matters Podcast with Jean Roche, Co-Manager of Schroder UK Mid Cap Investment Trust has just been released. Listen here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksSerica Energy Share News (SQZ)

Share Price Information for Serica Energy (SQZ)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 176.50
Bid: 176.30
Ask: 177.10
Change: -4.90 (-2.70%)
Spread: 0.80 (0.454%)
Open: 178.20
High: 180.40
Low: 175.40
Prev. Close: 181.40
SQZ Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Serica Energy upbeat on Columbus well flow test results

Tue, 13th Jul 2021 10:03

(Sharecast News) - UK North Sea-focussed upstream oil and gas company Serica Energy announced successful flow test results from the Columbus development well on Tuesday, reporting that the well was drilled to a measured depth of 17,600 feet, with a horizontal section of more than a mile in length in the Forties Sandstone formation.
The AIM-traded firm said completion equipment was successfully installed into the well, and a flow test had now been performed.

A stabilised flow rate of 38.0 million standard cubic feet of gas per day, and 1,560 barrels of condensate per day, had been achieved through a 56/64th-inch choke.

That rate was at the upper end of the pre-drill range of expected outcomes, and was constrained by the surface well test equipment on board the Maersk Resilient heavy-duty jack-up drilling rig.

A diving support vessel (DSV) would tie the subsea wellhead into the Arran Field export system directly after the rig leaves the location.

It was expected that Columbus start-up would occur in the fourth quarter, once initial flow from the Arran field had reached stable conditions.

Once it has been brought on stream, it was anticipated that the Columbus well would produce at around 7,000 barrels of oil equivalent gross per day, of which at least 75% was expected to be gas.

Columbus was discovered by Serica in 2006, with Serica having a 50% interest and acting as operator throughout the exploration, appraisal and field development stages.

It had developed the field with its partners Waldorf Production UK and Tailwind Energy.

Minimal subsea equipment had been installed to enable tie-in of the Columbus well to adjacent infrastructure, thus minimising environmental impact and carbon dioxide emissions, the board said.

That was consistent with the company's stated objective of reducing the carbon intensity of its production operations.

"We are delighted to have achieved the objectives of this challenging but ultimately very successful campaign," said chief executive officer Mitch Flegg.

"This is a significant milestone for Serica, demonstrating our ability to successfully lead a development project as well as being a proven efficient production operator.

"Columbus is part of Serica's ongoing capital investment programme which is aimed at boosting production in the second half of this year and beyond."

At 0944 BST, shares in Serica Energy were up 2.95% at 153.6p.
More News
30 Sep 2016 11:25

Serica Energy losses widen due to production shut-down

(ShareCast News) - Serica Energy announced its interim financial results for the six months to30 June on Friday, posting a net loss after tax for of $2.8m, widening from $0.64m year-on-year, as a result of the field shut-in during the period. Production was interrupted during the period, the company

Read more
6 Sep 2016 11:38

Serica Energy provides update on restarted Erskine production

(ShareCast News) - Serica Energy updated the market on its operations on Tuesday, after Lomond platform operator Shell advised that the issues concerning the re-commissioning of the platform's export facilities have been resolved. The AIM-traded firm said as a result, Erskine oil and gas production

Read more
6 Sep 2016 09:17

Serica Energy Says Full Production Resumed At Erskine Field

Read more
29 Jul 2016 12:20

Serica Energy resumes Erskine oil and gas output

(ShareCast News) - Serica Energy said oil and gas production has resumed at the Erskine field after a pipeline blockage was cleared, and scheduled maintenance completed at the Lomond platform. "Since Serica acquired its interest in the Erskine field in June 2015, it has made a significant contributi

Read more
19 Apr 2016 09:42

Erskine Acquisition Helps Serica Energy Swing To Profit In 2015

Read more
17 Mar 2016 08:38

Serica First Quarter Production To Be Hit By Suspension Of Erskine

Read more
14 Dec 2015 08:51

Serica Energy Says Production Improves In October And November

Read more
27 Oct 2015 09:16

Serica Energy inks deal with BG and SSE

(ShareCast News) - Oil explorer Serica Energy has reached a deal with BG Group and SSE to increase its resource stake in the Columbus Field offshore the UK by 50% to 7.8m barrels of oil equivalent. Serica is currently in a joint venture on Block 23/16f with Endeavour Energy and EOG Resources, with a

Read more
27 Oct 2015 08:42

Serica Gets 50% Boost To Resources After Striking Deal With BG, SSE

Read more
30 Sep 2015 15:57

LONDON MARKET CLOSE: Stocks End Dismal Quarter On Positive Note

Read more
30 Sep 2015 13:48

Serica Energy Shares Jump 50% As It Enters Production In UK North Sea

Read more
16 Jul 2015 10:01

Serica Energy Says Initial Results From Erksine Field "Encouraging"

Read more
30 Jun 2015 07:31

LONDON BRIEFING: Shares Ignore Positive Asian Session To Open Lower

Read more
30 Jun 2015 05:16

AGM, EGM Calendar - Week Ahead

Read more
29 Jun 2015 15:11

AGM, EGM Calendar - Week Ahead

Read more

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.