Roundtable Discussion; The Future of Mineral Sands. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksZephyr Energy Regulatory News (ZPHR)

Share Price Information for Zephyr Energy (ZPHR)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 4.85
Bid: 4.70
Ask: 5.00
Change: 0.25 (5.38%)
Spread: 0.30 (6.383%)
Open: 4.65
High: 4.90
Low: 4.85
Prev. Close: 4.65
ZPHR Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Positive State 16-2LN-CC well log data analysis

18 Aug 2021 07:00

RNS Number : 9617I
Zephyr Energy PLC
18 August 2021
 

Prior to publication, the information contained within this announcement was deemed by the Company to constitute inside information as stipulated under the UK Market Abuse Regulation. With the publication of this announcement, this information is now considered to be in the public domain.

 

 

18 August 2021

Zephyr Energy plc

(the "Company" or "Zephyr")

 

Positive results from the analysis of the State 16-2LN-CC well log data;

initiation of diagnostic fracture injection test;

 and next steps

 

Zephyr Energy plc (AIM: ZPHR) (OTCQB: ZPHRF), the Rocky Mountain oil and gas company focused on responsible resource development and carbon-neutral operations, provides an update on its flagship project in the Paradox Basin, Utah, U.S.A.

 

The Company recently drilled the State 16-2LN-CC well to a Total Depth ("TD") of 14,370 feet ("ft"), at which point a full suite of wireline logs was run and production casing was set. During drilling operations, the Cane Creek reservoir target indicated hydrocarbon charge across its entirety based on wireline logs, cuttings and mud gas readings. Multiple overlying reservoirs also indicated hydrocarbon charge.

 

The Company is now pleased to report that the initial analysis of wireline log and other data from the State 16-2LN-CC has been completed.

 

Highlights

 

· The horizontal portion of the well penetrated 4,555 ft of the Cane Creek reservoir. Wireline log data suggests a high percentage of the lateral portion of the well (approximately 85 per cent) can be completed for production.

 

· The State 16-2LN-CC well drainage area from the Cane Creek reservoir is estimated to hold a potential 1.2 to 4.5 million barrels of oil equivalent ("mmboe") of hydrocarbons in place.

 

· Ultimate well performance and recoverable oil and gas will be determined by matrix permeability, reservoir pressure, the level of moveable water in the reservoir and the degree of successful stimulation:

Primary reservoir facies show average porosity of approximately 7 per cent, rising to approximately 12 per cent in places. Porosity is comparable with earlier core results from the State 16-2 vertical well.

o Analysis indicates good matrix permeability for a Hydraulically Stimulated Resource Play ("HSRP") development, based on State 16-2 core permeability measurements and correlation with core porosity.

o Initial well production rates and recoverable resources will be estimated following the injection test and selection of an optimal completion method as detailed below.

 

· In addition, mass spectrometry of the well's mud gas from the Cane Creek reservoir indicated the following:

o The presence of oil, gas and condensate and

o Low water saturation

 

Based on the positive analysis to date, the excellent positioning of the lateral portion of the well within the Cane Creek reservoir, and the potential to utilise the State 16-2LN-CC completion as a proof of concept well for wider development of the Paradox asset base via hydraulic stimulation, the Company has opted to initiate a diagnostic fracture injection test ("DFIT") on the well.

 

The DFIT operation will commence on site today. Results from the DFIT, in combination with the reservoir analysis detailed above, will allow Zephyr to finalise the method for optimal well completion in the near term, with production testing commencing immediately after a successful completion of the well.

 

Colin Harrington, Zephyr's Chief Executive, said: "As announced last week, the State 16-2LN-CC landed successfully in the Cane Creek reservoir with excellent positioning throughout the horizontal portion of the well. I'm now pleased to report that our analysis suggests that up to 85 per cent of the lateral has the potential to be completed for well testing and production. I'm also pleased to see porosity and permeability estimates equivalent to other producing basins with prolific HSRP development, as well as mud gas mass spectrometry evidence for the presence of oil, gas and condensate with corresponding apparent low water saturations.

"Based on the preponderance of positive data received, we elected to initiate a DFIT to provide additional insight into the potential for successful hydraulic stimulation on our acreage position. As the State 16-2LN-CC is the first horizontal well in this part of the Paradox Basin, the ability to develop a strong understanding of reservoir mechanical properties is crucially important as we assess the series of options for wider potential development. It's also important to note that if the HSRP completion route is selected, we believe it could allow for a simpler surface footprint and more predictable well patterns, including the grouping of multiple wells from a single pad, thereby maximising resource efficiency and project economics while minimising environmental and surface disruption.

 

"The current wellbore provides an excellent platform from which to assess these development options prior to production testing the well. We expect DFIT operations and monitoring to progress over the course of the next week, after which a final decision regarding selection of method for well completion will be made. Completion operations and production testing will begin as soon as possible thereafter, and we look forward to keeping Shareholders informed as more milestones are reached."

 

 

Contacts:

 

Zephyr Energy plc

Colin Harrington (CEO)

Chris Eadie (CFO)

 

 Tel: +44 (0)20 7225 4590

Allenby Capital Limited - AIM Nominated Adviser

Jeremy Porter / Liz Kirchner

 

 Tel: +44 (0)20 3328 5656

 

Turner Pope Investments - Broker

Andy Thacker / James Pope

 

Flagstaff Strategic and Investor Communications

Tim Thompson / Mark Edwards / Fergus Mellon

 Tel: +44 (0)20 3657 0050

 

 

Tel: +44 (0) 20 7129 1474

 

Dr Gregor Maxwell, BSc Hons. Geology and Petroleum Geology, PhD, Technical Adviser to the Board of Zephyr Energy plc, who meets the criteria of a qualified person under the AIM Note for Mining and Oil & Gas Companies - June 2009, has reviewed and approved the technical information contained within this announcement.

 

Estimates of resources and reserves contained within this announcement have been prepared according to the standards of the Society of Petroleum Engineers. All estimates are internally generated and subject to third party review and verification.

 

Glossary of Terms

 

Hydrocarbon Initially In Place (HCIIP) - Quantity of hydrocarbon that is estimated, as of a given date, to be contained in known accumulations before production. HCIIP may be subdivided into commercial, sub-commercial, and the portion remaining in the reservoir as unrecoverable.

 

 

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
DRLFFFLLTAIDLIL
Date   Source Headline
11th May 20213:50 pmRNSExercise of warrants and change to TVR
5th May 20214:41 pmRNSSecond Price Monitoring Extn
5th May 20214:35 pmRNSPrice Monitoring Extension
4th May 20217:00 amRNSFirst North Dakota revenues, acquisition & Paradox
30th Apr 20215:00 pmRNSTotal Voting Rights
30th Apr 202112:06 pmRNSHolding(s) in Company
29th Apr 20213:04 pmRNSHolding(s) in Company
29th Apr 20217:00 amRNSHolding(s) in Company
19th Apr 20218:30 amRNSDirector/PDMR/PCA Shareholdings
16th Apr 202110:50 amRNSResult of GM & change to TVR
9th Apr 202111:46 amRNSHolding(s) in Company
1st Apr 20217:00 amRNSCompletion of acquisition in the Bakken Formation
31st Mar 20215:00 pmRNSTotal Voting Rights
29th Mar 20217:00 amRNSProposed acquisition and £10m placing
22nd Mar 20214:57 pmRNSExercise of warrants and change to TVR
16th Mar 20217:00 amRNSHolding(s) in Company
15th Mar 20217:00 amRNSBoard approval to proceed with State 16-2 lateral
26th Feb 20215:00 pmRNSTotal Voting Rights
25th Feb 20215:44 pmRNSHolding(s) in Company
24th Feb 202111:35 amRNSExercise of warrants and change to TVR
16th Feb 202112:00 pmRNSExercise of warrants and change to TVR
11th Feb 20215:48 pmRNSPresentation & updated well & project economics
9th Feb 20217:00 amRNSInvestor Presentation
3rd Feb 202110:50 amRNSExercise of warrants and change to TVR
2nd Feb 20216:24 pmRNSHolding(s) in Company
29th Jan 20215:00 pmRNSTotal Voting Rights
29th Jan 202111:58 amRNSExercise of warrants and change to TVR
29th Jan 20217:00 amRNSInitial evaluation of State 16-2 well log data
28th Jan 20217:00 amRNSExercise of warrants and change to TVR
26th Jan 202110:46 amRNSExercise of warrants and change to TVR
25th Jan 20215:45 pmRNSHolding(s) in Company
25th Jan 20217:00 amRNSCorporate Update (inc. State 16-2 well)
20th Jan 202112:13 pmRNSExercise of warrants and change to TVR
15th Jan 20219:22 amRNSHolding(s) in Company
14th Jan 20217:00 amRNSState 16-2 Well Update
4th Jan 20217:00 amRNSState 16-2well, business development & '21 outlook
21st Dec 20207:55 amRNSPhoto gallery of State 16-2 well operations
18th Dec 20207:00 amRNSState 16-2 well commencement of drilling
10th Dec 20207:00 amRNSParadox State 16-2 well update
3rd Dec 20207:00 amRNSAward of drilling contract to Cyclone Drilling Inc
2nd Dec 20208:23 amRNSGrant of final approvals for State 16-2 well
30th Nov 20205:00 pmRNSTotal Voting Rights
27th Nov 20208:49 amRNSInvestor Presentation ahead of drilling campaign
19th Nov 20204:38 pmRNSHolding(s) in Company
19th Nov 20201:30 pmRNSHolding(s) in Company
19th Nov 20207:00 amRNSParadox well -commencement of operational activity
12th Nov 20207:00 amRNSPresentation re Paradox Basin: History & Potential
10th Nov 20201:04 pmRNSHolding(s) in Company
6th Nov 20207:00 amRNSHolding(s) in Company
2nd Nov 202010:32 amRNSResult of General Meeting and Total Voting Rights

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.