Less Ads, More Data, More Tools Register for FREE

Pin to quick picksZephyr Energy Regulatory News (ZPHR)

Share Price Information for Zephyr Energy (ZPHR)

Share Price is delayed by 15 minutes
Get Live Data
3.00    -0.10 (-3.23%)
Bid:
2.90
Ask:
3.10
Spread: 0.20 (6.897%)
Market Cap: £63.02m
ZPHR Live PriceLast checked at - London Stock Exchange

Intraday Zephyr Energy Share Chart

Paradox project update

8 Apr 2025 07:00

RNS Number : 0118E
Zephyr Energy PLC
08 April 2025
 

Prior to publication, the information contained within this announcement was deemed by the Company to constitute inside information as stipulated under the UK Market Abuse Regulation. With the publication of this announcement, this information is now considered to be in the public domain.

8 April 2025

Zephyr Energy plc

("Zephyr" or the "Company")

Paradox project update

 

Zephyr Energy plc (AIM: ZPHR) (OTCQB: ZPHRF) is pleased to provide an update on completion and production testing operations on the State 36-2 LNW-CC-R well (the "well") at its project in the Paradox Basin, Utah, U.S.

Over the last two weeks, the lateral portion of the well was successfully perforated with 98 cuts across a total of 16 stages targeting optimised sections of the reservoir. As part of the operations, the Company deployed a wellbore perforating technology developed by Halliburton which used a mix of sand and water to cut cavities through the casing and into the reservoir in order to maximise the reservoir's connectivity. 

Pressure response during the cutting operations suggests the wellbore has good connection to the highly pressured Cane Creek reservoir. After perforations were completed, the well was treated with acid, as planned, to maximise near-wellbore formation permeability. 

The Company will shortly commence production testing. As part of the operation, a fibre optic cable is planned to be deployed alongside the production tubing to gather pressure and temperature data so that the production rate of each individual stage may be assessed. This will allow Zephyr's team to further understand the production capacity of the reservoir and to optimise stimulation techniques for future operations. 

The Company continues to anticipate that initial production test results will be available by the end of April 2025, subject to weather and vendor schedules.

Colin Harrington, Zephyr's Chief Executive, said:

 

"We are highly encouraged by operations to date and are excited about the imminent commencement of the production testing.

 

"We look forward to providing further updates in due course."

 

Contacts

Zephyr Energy plc

Colin Harrington (CEO)

Chris Eadie (Group Finance Director and Company Secretary)

 

 Tel: +44 (0)20 7225 4590

Allenby Capital Limited - AIM Nominated Adviser

Jeremy Porter / Vivek Bhardwaj

 

 Tel: +44 (0)20 3328 5656

 

Turner Pope Investments - Joint-Broker

James Pope / Andy Thacker 

 

Canaccord Genuity Limited - Joint-Broker

Henry Fitzgerald-O'Connor / Charlie Hammond

 

Celicourt Communications - PR

Mark Antelme / Felicity Winkles / Ali AlQahtani

 Tel: +44 (0)20 3657 0050

 

 

Tel: +44 (0)20 7523 8000

 

 

 

Tel: +44 (0) 20 7770 6424

 

 

 

 

 

Qualified Person

Dr Gregor Maxwell, BSc Hons. Geology and Petroleum Geology, PhD, Technical Adviser to the Board of Zephyr Energy plc, who meets the criteria of a qualified person under the AIM Note for Mining and Oil & Gas Companies - June 2009, has reviewed and approved the technical information contained within this announcement.

 

Notes to Editors

Zephyr Energy plc (AIM: ZPHR) (OTCQB: ZPHRF) is a technology-led oil and gas company focused on responsible resource development from carbon-neutral operations in the Rocky Mountain region of the United States. The Company's mission is rooted in two core values: to be responsible stewards of its investors' capital, and to be responsible stewards of the environment in which it works.

 

Zephyr's flagship asset is an operated 46,000-acre leaseholding located in the Paradox Basin, Utah, 25,000 acres of which has been assessed to hold, net to Zephyr, 2P reserves of 2.6 million barrels of oil equivalent ("mmboe"), 2C resources of 34 mmboe and 2U resources 270 mmboe.

 

In addition to its operated assets, the Company owns working interests in a broad portfolio of non-operated producing wells across the Williston Basin in North Dakota and Montana. Cash flow from the Williston production will be used to fund the planned Paradox Basin development. In addition, the Board will consider further opportunistic value-accretive acquisitions. 

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
UPDIRMBTMTTMTRA
Date   Source Headline
18th Dec 20207:00 amRNSState 16-2 well commencement of drilling
10th Dec 20207:00 amRNSParadox State 16-2 well update
3rd Dec 20207:00 amRNSAward of drilling contract to Cyclone Drilling Inc
2nd Dec 20208:23 amRNSGrant of final approvals for State 16-2 well
30th Nov 20205:00 pmRNSTotal Voting Rights
27th Nov 20208:49 amRNSInvestor Presentation ahead of drilling campaign
19th Nov 20204:38 pmRNSHolding(s) in Company
19th Nov 20201:30 pmRNSHolding(s) in Company
19th Nov 20207:00 amRNSParadox well -commencement of operational activity
12th Nov 20207:00 amRNSPresentation re Paradox Basin: History & Potential
10th Nov 20201:04 pmRNSHolding(s) in Company
6th Nov 20207:00 amRNSHolding(s) in Company
2nd Nov 202010:32 amRNSResult of General Meeting and Total Voting Rights
30th Oct 20205:00 pmRNSTotal Voting Rights
22nd Oct 20207:00 amRNSParadox Project Update
16th Oct 20207:00 amRNSIssue of equity and notice of general meeting
7th Oct 20207:00 amRNSPresentation re Paradox dual-purpose well
5th Oct 20207:00 amRNSParadox well to be spudded by year-end
17th Sep 20207:00 amRNSHalf-year Report
2nd Sep 20207:00 amRNSParadox Acreage Chosen for Stratigraphic Well

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.