The next focusIR Investor Webinar takes places on 14th May with guest speakers from Blue Whale Growth Fund, Taseko Mines, Kavango Resources and CQS Natural Resources fund. Please register here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksZenith Energy Regulatory News (ZEN)

Share Price Information for Zenith Energy (ZEN)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 2.05
Bid: 2.00
Ask: 2.10
Change: 0.00 (0.00%)
Spread: 0.10 (5.00%)
Open: 2.05
High: 2.05
Low: 2.05
Prev. Close: 2.05
ZEN Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Zardab Field Operational Update

20 Oct 2017 07:00

RNS Number : 1446U
Zenith Energy Ltd
20 October 2017
 

October 20, 2017

 

ZENITH ENERGY LTD.

("Zenith" or the "Company")

Zardab Field Operational Update

 Zenith Energy Ltd. ("Zenith" or the "Company") (LSEZENTSX.VZEE), the dual listed international oil & gas production company operating the largest onshore oilfield in Azerbaijan, is pleased to announce an operational update on wells Z-21 and Z-28 in the Zardab field, Azerbaijan.

 

The Company's operational team is routinely performing checks on a number of wells across the Zardab field.

 

The Company has recently carried out an intervention in the Z-21 well, specifically by coiled tubing and wireline, without the use of a workover rig. Well Z-21 had been shut-in since 1988 and no surface pressure had previously been recorded in well inspections.

 

Well Z-21 has periodically been flowed since the completion of this work, producing at a rate below 5 BOPD with negligible wellhead surface pressure recorded. On account of this low production it was decided not to flow the well for a period of two weeks.

 

On October 18, 2017, an unforeseen build-up in pressure caused a blowout after the failure of a flange on the wellhead. The Company's field personnel immediately sealed the well and replaced the broken flange. Zenith's environmental team arrived on-site within 15 minutes and the Z-21 wellsite has now been environmentally restored.

 

A subsequent well test on October 19, 2017 observed that the surface pressure of well Z-21 had substantially increased and stabilised at 30 atmospheres (atm), with a peak surface pressure reading of 90 atm. The Company's operational team views the significant increase in pressure as highly surprising, especially as previous well tests had, as aforementioned, recorded very low surface pressure.

 

The Company cannot forecast the potential post-workover oil production achievable from well Z-21 on the basis of the high pressure now recorded at this well, but the data strongly confirms that there is significant bottomhole pressure with large quantities of oil to be produced. Well tests will continue to take place until the ZJ-30 180 tonne workover rig, currently engaged in the workover of well Z-28, is scheduled to arrive in November 2017. 

 

 

Update on high-impact workover of well Z-28

 

 

The Company is pleased to provide an update on the workover of well Z-28. This is the most significant workover that the Company has undertaken since Zenith began operations in Azerbaijan.

 

Well Z-28 has been cleaned out with all tubing removed to a depth of 2922 metres. The next task is to perform a well cleanout down to the liner top at a depth of 3568 metres. The Company's petroleum engineers are regularly examining data collected from the well in order to clean out the liner and maximise the potential success of the workover. A quad neutron log has been run to the depth of 2922 metres, providing the most advanced well log recorded in the Zardab field. Whilst this technology has not yet been run through the productive series of the well, it has provided highly valuable information that is now being analysed.

 

Mike Palmer, Chief Operating Officer, Zenith Aran, the Company's Azerbaijan-based fully owned subsidiary, commented:

"Zardab is a young, hugely unexploited field with original high reservoir pressure. The blowout at Z-21 confirms Zardab's vitality and abundance in oil. I have had a lot of oilfield surprises in my 37 years of activity in the industry, most of them bad. The very high pressure generated without warning in Z-21 is not only a surprise, but a complete shock. Indeed, I was fortunate enough to view this first-hand whilst on location. Our small, inexpensive and systematic well interventions are paying off. There is a lot of work to be done before we can produce the well, but we expect a successful workover of Z-21 to generate significant production. 

I am pleased with the rapid progress achieved at Z-28. This is a challenging workover and we have been able to overcome all the problems that we have encountered. The next few weeks will be slow and difficult, but we are confident that we can get the job done successfully. We have assembled one of the most talented operational teams in the region."

 

 

For further information, please contact:

 

Zenith Energy Ltd.

Andrea Cattaneo

Chief Executive Officer 

Email: info@zenithenergy.ca

Tel: +1 (587) 315 9031

Fax: +1 (403) 775 4474

 

Optiva Securities - (Joint Broker)

Christian Dennis

Tel: + 44 (0) 203 137 1903

 

Beaufort Securities Limited - (Joint Broker) 

Jon Belliss

Tel: +44 207 382 8300 

 

Allenby Capital Limited (Financial Adviser)

Nick Harriss

Nick Athanas

Richard Short

Tel:   + 44 (0) 203 328 5656

 

Yellow Jersey (Financial PR/IR)

Tim Thompson

Tel: +44 (0) 203 735 8825

 

 

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLPGGPWUUPMUUU
Date   Source Headline
10th Apr 20177:40 amRNSTeam A Operational Update, Azerbaijan
10th Apr 20177:00 amRNSUpdate - Convertible Notes and Admission of Shares
3rd Apr 20172:18 pmRNSHolding(s) in Company
3rd Apr 20177:00 amRNSZenith Announces Change of Auditor
23rd Mar 20174:30 pmRNSHolding(s) in Company
22nd Mar 20177:00 amRNSAppointment of Director
21st Mar 20171:30 pmRNSConversion of Sterling Denominated Loan Note
16th Mar 201711:44 amRNSHolding(s) in Company
16th Mar 20177:00 amRNSAppointment of Joint Broker and Azerbaijan Update
14th Mar 20177:00 amRNSUpdate on Previous Debt for Equity Announcement
6th Mar 20177:00 amRNSInterim Update on Workover of Well M-195
1st Mar 20177:44 amRNSZenith Announces 3rd Quarter Results
1st Mar 20177:00 amRNSZenith Announces Settlement of Debt for Shares
22nd Feb 20177:00 amRNSDirector Exercises Stock Options
20th Feb 20177:45 amRNSZenith Divests Argentine Operations
10th Feb 20177:00 amRNSSudden Passing Of Director
9th Feb 20177:00 amRNSWorkover Rig Begins Operations At Well M-195
8th Feb 201712:50 pmRNSHolding(s) in Company
31st Jan 20177:00 amRNSUpdate on Regulatory Matters
30th Jan 20177:40 amRNSZenith Issues Equity
30th Jan 20177:00 amRNSZenith Further Reduces Debt
25th Jan 20177:00 amRNSCEO Foregoes Salary in Lieu of Equity at Premium
24th Jan 20177:00 amRNSZenith Commences Workover Programme in Azerbaijan
23rd Jan 201710:01 amRNSAGM RESULTS AND ADOPTION OF ADVANCE NOTICE POLICY
23rd Jan 20177:00 amRNSAGM Results and Adoption of Advance Notice Policy
19th Jan 20177:40 amRNSZenith Energy Align Research note release
18th Jan 201710:30 amRNSHolding(s) in Company
13th Jan 20173:40 pmRNSDirector/PDMR Shareholding
11th Jan 20177:00 amRNSAdmission to Official List LSE and Placing

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.