We would love to hear your thoughts about our site and services, please take our survey here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksZenith Energy Regulatory News (ZEN)

Share Price Information for Zenith Energy (ZEN)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 2.25
Bid: 2.00
Ask: 2.50
Change: 0.00 (0.00%)
Spread: 0.50 (25.00%)
Open: 0.00
High: 0.00
Low: 0.00
Prev. Close: 2.15
ZEN Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Operational Update and Record Oil Revenue

18 May 2018 07:00

RNS Number : 5005O
Zenith Energy Ltd
18 May 2018
 

May 18, 2018

The information contained within this announcement is deemed by the Company to constitute inside information as stipulated under the Market Abuse Regulation (EU) No. 596/2014 ("MAR"). Upon publication of this announcement via a regulatory information service ("RIS"), the inside information contained in this document is now considered to be in the public domain.

ZENITH ENERGY LTD.

("Zenith" or the "Company")

Operational Update and Record Oil Production Revenue

Zenith Energy Ltd., ("Zenith" or the "Company"), (LSEZENTSX.VZEE), the international oil & gas production company operating the largest onshore oilfield in Azerbaijan, is pleased to provide an update on its operational progress in the Zardab field.

Z-21 workover

As announced on May 8, 2018, Zenith has pulled out a mixed string, comprised of 2 3/8" and 2 7/8" tubing, totalling 3,504 metres, as well as all of the 4 5" tubing, totalling 1,500 metres, using its A-80 workover rig. In addition, in the period since the aforementioned update, 111 metres of tubing from 3,504-3,615 metres has been successfully cleaned out. Zenith has been unable to run wash pipe beyond the depth of 3,615 metres to fish the remaining 166 metres of 2 3/8" tubing in the wellbore due to an unforeseen change in the tubing diameter. The change in tubing diameter was undocumented in any Z-21 well data.

The Company now intends to pull the entire tubing string out of the well. It has been determined that a more powerful rig will be required to perform the task. Once this is completed, Zenith's field personnel plans to run in hole with a drill bit and clean out the casing to the well's total depth, 3,982 metres, and subsequently perform a production test.

The larger rig will also have the capacity to deepen well Z-21 beyond the Maykop formation into the Eocene formation by drilling an additional 300 metres, extending the well's total depth to approximately 4,270-4,300 metres. As announced on May 8, 2018, the final decision on the deepening of Z-21 will depend on the outcomes of the production tests to be performed once the casing has been cleaned out to the well's current total depth. The Company will not perform any drilling operations in Z-21 if a satisfactory rate of production were to be achieved from the Maykop formation.

 

The primary reason for the evaluation of this possibility is the proximity of Z-21 to well Z-3, spud in 1979 and drilled to a total depth of 4,300 metres into the Eocene and Upper Cretaceous formations. Z-3 tested approximately 2,900 barrels of mixed hydrocarbons per day before the wellbore collapsed.

 

Zenith confirms that it is currently in negotiations for the contracting of a ZJ-30 150-ton workover rig to complete the Z-21 workover. An update will be provided when the rig has been mobilised to the well location.

The Company also intends to use this rig for the workover of Z-3, where historical records indicate 775 metres of tubing has been left in the well, and for the completion of the Z-28 workover, where 69 metres of tubing require milling out before the well is cleaned out to total depth, 3,944 metres.

 

Electrical Submersible Pump Upgrade Programme (the "Upgrade Programme")

 

As announced by Zenith on August 22, 2017, the Upgrade Programme involves the installation of new electrical submersible pumps in wells located in the Muradkhanli and Jafarli oilfields. The purpose of the Upgrade Programme is to stabilise existing production from the selected wells and lessen the likelihood of production outages often resulting from older ESP technology. In addition, the Company is also setting the pumps at an average depth of 2,500 meters to achieve greater production from the wells. The previous ESP technology limited the setting depths to 1,500 meters.

 

The Company confirms that its A-80 workover rig has left the Z-21 well location to resume field rehabilitation activities in the Muradkhanli and Jafarli fields. These operations include electrical submersible pump maintenance work and the installation of a new electrical submersible pump. Following this installation, the total number of new electrical submersible pumps installed in the Muradkhanli and Jafarli fields will be 12. Zenith's field team is routinely monitoring production and it is expected that the number of wells included in the upgrade programme will be increased further.

 

 

Record Oil Production Revenue

 

The Company is pleased to confirm that its gross oil production revenue has reached a new all-time record high since Zenith began operations in Azerbaijan. The Company's subsidiary generated revenue, gross of commissions and transportation expenses, of approximately US$505,000 for its oil production during the month of April 2018.

 

 

Mike Palmer, Chief Operating Officer, Zenith Aran, the Company's Azerbaijan-based fully owned subsidiary, commented:

"We have achieved a number of key milestones using our own equipment. This has allowed us to greatly reduce our operational expenditure, and this is all the more positive when set against the backdrop of the Company achieving record oil production revenue in Azerbaijan.

The 150-ton workover rig we are looking to contract is significantly more advanced and powerful than our A-80 rig. It will enable us to increase our work rate, pull the entire tubing string, and clean out the wellbore to TD in Z-21.

 

The ongoing geological study of Zardab has encouraged us to greatly increase our efforts in this field and, accordingly, we have decided to maximise the use of our resources in the area. The new rig will play a key part in exploiting the big opportunities we have at hand."

 

For further information please contact:

Zenith Energy Ltd.

Andrea Cattaneo 

Chief Executive Officer 

E-mail: info@zenithenergy.ca

Tel: +1 (587) 315 9031

 

Vigo Communications - PR Adviser

Patrick d'Ancona

Chris McMahon 

Kate Rogucheva

Tel: +44 (0) 20 7830 9700

 

Daniel Stewart & Company Plc - (Joint Broker)

Robert Emmet- Corporate Broking

Nikhil Varghese- Corporate Finance 

Tel: + 44 (0) 207 776 6550

 

Optiva Securities - (Joint Broker)

Christian Dennis

Tel: + 44 (0) 203 137 1903

 

Allenby Capital Limited (Financial Adviser)

Nick Harriss

Nick Athanas

Tel: + 44 (0) 203 328 5656

 

 

Notes to Editors

Zenith Energy Ltd. is an international oil and gas production company, dual listed on the TSX Venture Exchange and London Stock Exchange. 

The Company operates the largest onshore oilfield in Azerbaijan following the signing of a 25-year REDPSA, (Rehabilitation, Exploration, Development and Production Sharing Agreement), with SOCAR, State Oil Company of the Azerbaijan Republic, in 2016. 

The Company's primary focus is the development of its Azerbaijan operations by leveraging its technical expertise and financial resources to maximise low-cost oil production via a systematic field rehabilitation programme intended to achieve significantly increased revenue. Zenith also operates, or has working interests in, a number of natural gas production concessions in Italy. The Company's Italian operations produce natural gas, natural gas condensate and electricity.

Zenith's development strategy is to identify and rapidly seize value-accretive hydrocarbon production opportunities in the onshore oil & gas sector. The Company's Board of Directors and senior management team have the experience and technical expertise to develop the Company successfully.

To find out more, visit www.zenithenergy.ca or follow Zenith on Twitter @zenithenergyltd

 

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLGGUWPAUPRPPM
Date   Source Headline
22nd Apr 20241:25 pmRNSNew Bond Exchange Offer
17th Apr 20246:20 pmRNSUpdated TCFD Disclosures in Annual Report
11th Apr 202411:45 amRNSSuccessful Conclusion of Bond Exchange Offer
2nd Apr 20247:00 amRNSTotal Voting Rights
20th Mar 20248:30 amRNSUpdate on Arbitrations against Republic of Tunisia
12th Mar 20245:50 pmRNSUpdate on Italian Energy Production Portfolio
11th Mar 20241:00 pmRNSPositive support for Bond Exchange Offer
1st Mar 20241:01 pmRNSUpdate on Bond Exchange Offer
22nd Feb 20242:15 pmRNSAdmission to trading of UK Financing Common Shares
13th Feb 20245:15 pmRNSCompletion of financing with institutional support
25th Jan 20247:30 amRNSBond exchange offer to investors
18th Jan 20241:40 pmRNSUpdate on United States portfolio
29th Dec 202312:02 pmRNSPublication of Half-Year Results
20th Dec 202311:50 amRNSAcquisition of Devonian Petroleum Limited
6th Dec 202311:00 amRNSICC Arbitration for SLK against Tunisia
30th Nov 202312:30 pmRNSNew Kazakhstan subsidiary and pre-contract terms
29th Nov 20239:40 amRNSICC Arbitral Tribunal awards costs
28th Nov 20237:00 amRNSMoU – South Sudan
9th Nov 202312:15 pmRNSPayment of 2026 multi-currency bond coupon
1st Nov 20239:15 amRNSICC Arbitration proceedings against ETAP
25th Oct 20232:30 pmRNSCommencement of Trading on OTCQB Venture Market
18th Oct 202311:01 amRNSSeizure on SMP's bank account
10th Oct 202311:45 amRNSAssignment of new Debt Issuer Credit Rating
4th Oct 20232:00 pmRNSAdmission to trading of Common Shares
29th Sep 202311:05 amRNSConfirmation of Debt Issuer Credit Rating
25th Sep 20236:30 pmRNSImplementation of Share Consolidation
22nd Sep 20236:30 pmRNSShare Consolidation
20th Sep 20233:50 pmRNSShare Consolidation
19th Sep 20239:45 amRNSThird MOU for oil production asset in Kazakhstan
15th Sep 20239:30 amRNSSecond MOU for oil production assets in Kazakhstan
4th Sep 202310:40 amRNSMOU and Exclusivity for asset in Kazakhstan
4th Sep 20237:00 amRNSTermination of SPA for acquisition of OMV Yemen
29th Aug 20237:00 amRNSAcquisition of US listed company
4th Aug 20235:20 pmRNSUpdate on Benin PSC
3rd Aug 202310:06 amRNSThird Acquisition in USA
2nd Aug 202312:00 pmRNSPayment of 2024 multi-currency bond coupon
31st Jul 202311:36 amRNSPublication of 2023 FY annual audited report
10th Jul 20238:15 amRNSConservative seizure of ETAP bank account
5th Jul 202311:35 amRNSSecond acquisition in USA
3rd Jul 202311:10 amRNSCourt rejects SMP’s request and awards damages
23rd Jun 20237:00 amRNSMOU with Ministry of Petroleum – South Sudan
7th Jun 20237:00 amRNSICSID Arbitration against the Republic of Tunisia
2nd Jun 20237:00 amRNSFirst Agreement for USA acquisition campaign
26th May 20238:00 amRNSStrategy Update
18th May 202312:21 pmRNSPayment of multi-currency bond coupon
17th Apr 20237:00 amRNSResult of AGM and Update on Block 1 PSC in Benin
14th Mar 20237:00 amRNSUpdate on Italian Electricity Production
10th Mar 20234:28 pmRNSChange of Auditor & Notice of AGM
6th Mar 20236:00 pmRNSHolding(s) in Company
28th Feb 20237:00 amRNSInstitutional investment in Zenith

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.