Chris Heminway, Exec-Chair at Time To ACT, explains why now is the right time for the Group to IPO. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksZenith Energy Regulatory News (ZEN)

Share Price Information for Zenith Energy (ZEN)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 2.05
Bid: 2.00
Ask: 2.10
Change: 0.00 (0.00%)
Spread: 0.10 (5.00%)
Open: 0.00
High: 0.00
Low: 0.00
Prev. Close: 2.05
ZEN Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Zardab Field Operational Update

20 Oct 2017 07:00

RNS Number : 1446U
Zenith Energy Ltd
20 October 2017
 

October 20, 2017

 

ZENITH ENERGY LTD.

("Zenith" or the "Company")

Zardab Field Operational Update

 Zenith Energy Ltd. ("Zenith" or the "Company") (LSEZENTSX.VZEE), the dual listed international oil & gas production company operating the largest onshore oilfield in Azerbaijan, is pleased to announce an operational update on wells Z-21 and Z-28 in the Zardab field, Azerbaijan.

 

The Company's operational team is routinely performing checks on a number of wells across the Zardab field.

 

The Company has recently carried out an intervention in the Z-21 well, specifically by coiled tubing and wireline, without the use of a workover rig. Well Z-21 had been shut-in since 1988 and no surface pressure had previously been recorded in well inspections.

 

Well Z-21 has periodically been flowed since the completion of this work, producing at a rate below 5 BOPD with negligible wellhead surface pressure recorded. On account of this low production it was decided not to flow the well for a period of two weeks.

 

On October 18, 2017, an unforeseen build-up in pressure caused a blowout after the failure of a flange on the wellhead. The Company's field personnel immediately sealed the well and replaced the broken flange. Zenith's environmental team arrived on-site within 15 minutes and the Z-21 wellsite has now been environmentally restored.

 

A subsequent well test on October 19, 2017 observed that the surface pressure of well Z-21 had substantially increased and stabilised at 30 atmospheres (atm), with a peak surface pressure reading of 90 atm. The Company's operational team views the significant increase in pressure as highly surprising, especially as previous well tests had, as aforementioned, recorded very low surface pressure.

 

The Company cannot forecast the potential post-workover oil production achievable from well Z-21 on the basis of the high pressure now recorded at this well, but the data strongly confirms that there is significant bottomhole pressure with large quantities of oil to be produced. Well tests will continue to take place until the ZJ-30 180 tonne workover rig, currently engaged in the workover of well Z-28, is scheduled to arrive in November 2017. 

 

 

Update on high-impact workover of well Z-28

 

 

The Company is pleased to provide an update on the workover of well Z-28. This is the most significant workover that the Company has undertaken since Zenith began operations in Azerbaijan.

 

Well Z-28 has been cleaned out with all tubing removed to a depth of 2922 metres. The next task is to perform a well cleanout down to the liner top at a depth of 3568 metres. The Company's petroleum engineers are regularly examining data collected from the well in order to clean out the liner and maximise the potential success of the workover. A quad neutron log has been run to the depth of 2922 metres, providing the most advanced well log recorded in the Zardab field. Whilst this technology has not yet been run through the productive series of the well, it has provided highly valuable information that is now being analysed.

 

Mike Palmer, Chief Operating Officer, Zenith Aran, the Company's Azerbaijan-based fully owned subsidiary, commented:

"Zardab is a young, hugely unexploited field with original high reservoir pressure. The blowout at Z-21 confirms Zardab's vitality and abundance in oil. I have had a lot of oilfield surprises in my 37 years of activity in the industry, most of them bad. The very high pressure generated without warning in Z-21 is not only a surprise, but a complete shock. Indeed, I was fortunate enough to view this first-hand whilst on location. Our small, inexpensive and systematic well interventions are paying off. There is a lot of work to be done before we can produce the well, but we expect a successful workover of Z-21 to generate significant production. 

I am pleased with the rapid progress achieved at Z-28. This is a challenging workover and we have been able to overcome all the problems that we have encountered. The next few weeks will be slow and difficult, but we are confident that we can get the job done successfully. We have assembled one of the most talented operational teams in the region."

 

 

For further information, please contact:

 

Zenith Energy Ltd.

Andrea Cattaneo

Chief Executive Officer 

Email: info@zenithenergy.ca

Tel: +1 (587) 315 9031

Fax: +1 (403) 775 4474

 

Optiva Securities - (Joint Broker)

Christian Dennis

Tel: + 44 (0) 203 137 1903

 

Beaufort Securities Limited - (Joint Broker) 

Jon Belliss

Tel: +44 207 382 8300 

 

Allenby Capital Limited (Financial Adviser)

Nick Harriss

Nick Athanas

Richard Short

Tel:   + 44 (0) 203 328 5656

 

Yellow Jersey (Financial PR/IR)

Tim Thompson

Tel: +44 (0) 203 735 8825

 

 

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLPGGPWUUPMUUU
Date   Source Headline
6th Dec 202111:00 amRNSLoan for African Development
1st Dec 20217:00 amRNSPublication of Half-Year Results
29th Nov 20214:36 pmRNSPrice Monitoring Extension
29th Nov 20217:00 amRNSOption Agreement for OML 141 RSC in Nigeria
22nd Nov 20212:05 pmRNSSecond Price Monitoring Extn
22nd Nov 20212:00 pmRNSPrice Monitoring Extension
22nd Nov 20217:00 amRNSAcquisition of SLK from CNPC
12th Nov 202112:00 pmRNSPublication of UK 2021 Prospectus
8th Nov 20217:00 amRNSUpdate on profitability of Italian operations
2nd Nov 202112:26 pmRNSCredit Rating Upgrade
2nd Nov 20217:00 amRNSCompletion of subscription for new shares
29th Oct 20217:00 amRNSSignificant production uplift from ROB-1
25th Oct 20217:00 amRNSSuccessful workover of ROB-1, onshore Tunisia
12th Oct 20217:00 amRNSWorkover of ROB-1, onshore Tunisia
5th Oct 20217:00 amRNSNew record electricity production revenue
16th Sep 20217:00 amRNSRecord electricity production revenue in Italy
14th Sep 20212:20 pmRNSCredit Rating Upgrade
9th Sep 20217:00 amRNSGranting of Stock Options
31st Aug 20217:00 amRNSExclusivity agreement for OML 141 RSC in Nigeria
31st Aug 20217:00 amRNSFiling of 2021 FY annual audited results
23rd Aug 202111:53 amRNSPayment of multi-currency bond coupon
20th Aug 20217:00 amRNSReceipt of payment from SNPC subsidiary in Congo
19th Aug 20217:15 amRNSMobilisation of rig to Robbana concession, Tunisia
9th Aug 202112:08 pmRNSInitiation of Analyst Coverage by Allenby Capital
30th Jul 202111:35 amRNSDirector/PDMR Shareholding
29th Jul 20217:00 amRNSDebt reduction
23rd Jul 202111:38 amRNSDonation of medical equipment in Tunisia
22nd Jul 202110:33 amRNS2021 Competent Person’s Report
12th Jul 20217:00 amRNSUpdate on Prospectus
8th Jul 20217:00 amRNSSale of Tunisian oil production
25th Jun 20217:00 amRNSExtension of KUFPEC acquisition & coupon payments
10th Jun 20217:00 amRNSDrilling activities in Robbana, onshore Tunisia
1st Jun 20217:00 amRNSDebt Reduction & Issue of Warrants
26th May 20217:00 amRNSLoan for Tunisian Development
18th May 20217:00 amRNSAppointment of Country Manager & Prospectus
13th May 20217:00 amRNSGranting of Stock Options
12th May 20217:00 amRNSCompletion of EPT acquisition
11th May 20217:00 amRNSCorrection: Norwegian institutional investment
10th May 20211:19 pmRNSNorwegian institutional investment in Zenith
30th Apr 202111:32 amRNSExercise of Warrants
30th Apr 20217:00 amRNSAcquisition of Robbana and El Bibane in Tunisia
23rd Apr 20217:00 amRNSDebt reduction, amendment of terms and warrants
21st Apr 20211:42 pmRNSHolding(s) in Company
21st Apr 20217:00 amRNSOffer to acquire oil production assets in Tunisia
8th Apr 20217:00 amRNSExtension of SPA for SLK acquisition from KUFPEC
29th Mar 20216:00 pmRNSHolding(s) in Company
25th Mar 202112:05 pmRNSDirector/PDMR Shareholding
24th Mar 202112:32 pmRNSCompletion of Ezzaouia acquisition
22nd Mar 20217:00 amRNSPrivate Placement in Norway
19th Mar 20217:00 amRNSExercise of Warrants

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.