The next focusIR Investor Webinar takes places on 14th May with guest speakers from Blue Whale Growth Fund, Taseko Mines, Kavango Resources and CQS Natural Resources fund. Please register here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksZenith Energy Regulatory News (ZEN)

Share Price Information for Zenith Energy (ZEN)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 2.05
Bid: 2.00
Ask: 2.10
Change: 0.00 (0.00%)
Spread: 0.10 (5.00%)
Open: 2.05
High: 2.05
Low: 2.05
Prev. Close: 2.05
ZEN Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Production restored at well M-66 in Azerbaijan

27 Jul 2017 07:00

RNS Number : 2256M
Zenith Energy Ltd
27 July 2017
 

July 27, 2017 

ZENITH ENERGY LTD.

("Zenith" or the "Company")

Production restored at well M-66 in Azerbaijan

 

Zenith Energy Ltd. ("Zenith" or the "Company") (LSEZENTSX.VZEE), the dual listed international oil & gas production company operating the largest onshore oilfield in Azerbaijan, is pleased to announce that production has successfully been restored at well M-66 in the Muradkhanli field.

 

Production History of well M-66

 

Well M-66 was drilled in 1978 with initial flow rates of 14 BOPD. Acid fracturing, performed shortly after completion, increased production to 284 BOPD. In 1999 well M-66 became shut in.

 

CTU Well Interventions

 

Well M-66 has been cleaned out to a depth of 3011 meters with a coiled tubing unit (CTU) using nitrogen. This procedure has restored production and achieved a flow rate of 15 BOPD. 150 barrels of oil which had accumulated in the wellbore were also recovered during the well intervention.

 

This operation is part of a larger, systematic programme towards economically maximising production at non-producing and underperforming wells across Zenith's 642.4 km2 contract area.

 

Team A, comprised of Zenith's field personnel operating the Company's workover rig, together with Team C, comprised of Smape Srl contractors operating a CTU, will now move to the Zardab field to engage in a series of high-impact workovers. A number of wells in this field produced in excess of 500 BOPD for a short period of time before they became plugged-up with sand.

 

Wells M-45 and M-195 Update

The Company is awaiting delivery of electric submersible pumps (ESP's) for both these wells. Zenith will release an update when the pumps have been installed and the resulting flow rates have been determined.

 

Zenith Chief Executive Officer, Andrea Cattaneo, commented:

"I am pleased with this result. The recently arrived coiled tubing unit is now being employed as much as possible in all our well interventions. Our technical skillset has also been enhanced by the arrival from Canada of two workover specialists, a reservoir engineer and a drilling engineer. Our operational capabilities will further improve when we complete the acquisition of a new Chinese manufactured workover rig. The Company will make an announcement when this is completed and a delivery date is defined.

M-66 was one of the many wells selected for coiled tubing interventions. The small operational outlay relative to the significant increase achieved in production revenue from this well should not be overlooked.

It is clear that there is a vast amount of oil under the surface in the Muradkhanli field. It should, however, also be underlined that well workovers on old Soviet wells will deliver only progressive production increases as opposed to the exceptional flow rates made possible by successfully drilling new wells. As stated in previous announcements, we intend to begin drilling activities in 2018.

I look forward to our operations in the Zardab field, where some of the Company's most promising wells are located. It is important to note that no significant operations have been performed in this field during the last twenty years. I am confident that the use of a coiled tubing unit, combined with a strengthened operational team, will deliver strong results."

 

For further information, please contact:

Zenith Energy Ltd.

José Ramón López-Portillo

Chairman

 

Andrea Cattaneo

CEO & President

Email: info@zenithenergy.ca

Telephone: +1 (587) 315 9031

Telefax: +1 (403) 775 4474

 

 

Allenby Capital Limited (Joint Broker)

Nick Harriss

Nick Athanas

Richard Short

Telephone:   + 44 (0) 203 328 5656

 

Optiva Securities - (Joint Broker)

Christian Dennis

Telephone: + 44 (0) 203 137 1903

 

  

Abchurch (Financial PR/IR)

Tim Thompson

Telephone: +44 (0) 200 7398 7700

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCSEFEDMFWSEFW
Date   Source Headline
17th Mar 20217:00 amRNSExtension of SPA for acquisition of SLK from CNPC
15th Mar 20219:36 amRNSAcquisition of oil production asset in Tunisia
9th Mar 20215:28 pmRNSHolding(s) in Company
3rd Mar 202111:32 amRNSHolding(s) in Company
24th Feb 20217:00 amRNSCredit Line Agreement & Debt Settlement
10th Feb 202111:05 amRNSSecond Price Monitoring Extn
10th Feb 202111:00 amRNSPrice Monitoring Extension
10th Feb 20219:05 amRNSSecond Price Monitoring Extn
10th Feb 20219:00 amRNSPrice Monitoring Extension
10th Feb 20217:00 amRNSSuccessful completion of IPU in Congo
5th Feb 20212:06 pmRNSSecond Price Monitoring Extn
5th Feb 20212:01 pmRNSPrice Monitoring Extension
29th Jan 202112:24 pmRNSUpdate on Bond Coupon Payments
18th Jan 202111:29 amRNSResult of AGM & Granting of Stock Options
11th Jan 20217:15 amRNSCooperation Agreement for new acquisitions in MENA
11th Jan 20217:00 amRNSSale of Common Shares held in Treasury
6th Jan 20217:00 amRNSDebt Reduction & Exercise of Warrants
30th Dec 20202:06 pmRNSSecond Price Monitoring Extn
30th Dec 20202:01 pmRNSPrice Monitoring Extension
30th Dec 202011:06 amRNSSecond Price Monitoring Extn
30th Dec 202011:00 amRNSPrice Monitoring Extension
30th Dec 20207:15 amRNSGranting of Stock Options
29th Dec 20204:41 pmRNSSecond Price Monitoring Extn
29th Dec 20204:36 pmRNSPrice Monitoring Extension
29th Dec 20202:06 pmRNSSecond Price Monitoring Extn
29th Dec 20202:00 pmRNSPrice Monitoring Extension
29th Dec 202012:39 pmRNSPayment for oil production
29th Dec 202011:05 amRNSSecond Price Monitoring Extn
29th Dec 202011:00 amRNSPrice Monitoring Extension
29th Dec 20209:05 amRNSSecond Price Monitoring Extn
29th Dec 20209:00 amRNSPrice Monitoring Extension
23rd Dec 20204:40 pmRNSSecond Price Monitoring Extn
23rd Dec 20204:35 pmRNSPrice Monitoring Extension
23rd Dec 20209:06 amRNSSecond Price Monitoring Extn
23rd Dec 20209:00 amRNSPrice Monitoring Extension
23rd Dec 20207:00 amRNSSuccessful bid for Tilapia II
18th Dec 20205:04 pmRNSChange of Auditor & Notice of AGM
9th Dec 20209:05 amRNSSecond Price Monitoring Extn
9th Dec 20209:00 amRNSPrice Monitoring Extension
30th Nov 20206:31 pmRNSFiling of Half-Year Results
24th Nov 20207:00 amRNSOperational Update
11th Nov 20207:30 amRNSUpdate on legal claim against SMP
10th Nov 20207:40 amRNSTermination of LOI
10th Nov 20207:30 amRNSTermination of Exploration in Azerbaijan
2nd Nov 202010:27 amRNSCondensed audited annual financial results
29th Oct 20207:00 amRNSFiling of audited annual financial results
26th Oct 202012:00 pmRNSUpdate on publication of audited results
6th Oct 202010:33 amRNSRequest for a Suspension
30th Sep 20206:27 pmRNSPreliminary unaudited annual financial results
25th Sep 20205:30 pmRNSCompletion of Financing

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.